Monday, October 4, 2010

Missouri Teaching Non-certificate

He's back - the Garze Castle Wall!

Only a few months ago you had to ask if he was away for work and answer the question in the affirmative. Overgrown and no structures were overgrown the castle walls more visible. This has been thanks to the program "more local", but changed.

In three work assignments more than 220 (!) Garz and Garzerinner, Tourists, Guest and surrounding residents actively involved. They put the heat at maximum about 1.5 ha released large plateau, the sports complex brought back to light, which is located directly next to the castle wall and were now fighting in the third labor input on 2 October with the slopes of the embankment. They were overgrown over the years as well.

50 volunteers aged from 3 to 73 years, first cleaned in preparation for Memorial Day, the area around the memorial. In several groups, including shrubs and bushes that had grown over the years around the castle wall were removed.
Both enjoy their work and the food - grilled firefighters - agreed, so that a lot could be done.

Another site at the third labor input was again the sports complex, where the top layer could be applied to the tracks, so that after the completion of remaining work to physical education at the castle wall in the way of anything.

Mayor Gitta Gohla is pleased and happy about the great commitment, points out that some supporters were with all three working operating times and hopes for the next year, this "strength (s) on site, order something together for the do smallest and oldest city in RĂ¼gen.

0 comments:

Post a Comment